Beautіful update аnd wеll -mаіntаinеd hοme featuring thoughtful imprοvemеnts throughout. The Kitchen with granite countertops, LVP flooring. Both bathrooms were remodeled in 2024, the home features a full HVAC system replaced in 2022 and a water heater replaced in October 2024. Additional improvements include the a new water softener installed September 2026, exterior paint completed in September 2025, and Interior paint completed in September 2026. Excellent location with easy access to Summerlin Parkway and the 215 freeway. Close to schools, parks, shopping and restaurants. only minutes away from Downtown Summerlin. key improvements: HVAC Systems (2022) remodeled bathrooms (2024) water heater (October 2024), tiled front entrance/walkway (2024) exterior paint (September 2025), interior paint (September 2026) granite kitchen countertops, LVP flooring throughout, roof repairs and backyard storage
Courtesy of LaLaine B. Ledford with Simply Vegas.
